logo
  1. printprint
  2. emailemail
  3. bookmarkbookmark
zero harm     100 years
Home divider 1 Company Profile divider 2 Our Sectors divider 3 How we work divider 4 Careers divider 5 Contact Us divider 6 Links
  1. Air
  2. Roads
  3. Rail
  4. Structures
  5. Water / Sewerage
  6. Infrastructure / Enabling
  7. Power & Energy
  8. Industrial
  9. Marine / River
DAA T1 Set Down Lanes
pointer 1Client: Dublin Airport Authority
pointer 2Value: €600k
pointer 3Construction Period: 5 months
pointer 4Year Completed: 2010
The works involved the reconstruction and reconfiguration of the T1 Set Down Lane areas of Dublin Airport. The works were carried out on a phased basis with detailed traffic and pedestrian management plans implemented for each stage.

The scope of works included:
- Excavation of the existing pavement and replacement with a 20 year design life construction.

- Reprofiling of the traffic islands between the traffic lanes including the provision of Kassel kerbs.

- Provision of twin 200mm diameter watermains and associated hydrants, valves and chambers as part of the airport campus potable and hydrant watermain upgrade scheme.

- Line markings, anti-skid and signs.
- Provision of 4 Nr Bus Shelters
- New pedestrian fencing
- Cleaning CCTV and refurbishment works to existing drains
thumbnail 1
thumbnail 2
thumbnail 3
is a registered trade mark
of Balfour Beatty plc
latest news footer divider 1 site map footer divider 2 accessibility footer divider 3 terms and conditions footer divider 4 privacy statement

Registered in Ireland, Reg. No. 905055, City Junction Business Park, Northern Cross, Malahide Road, Dublin 17  +353 (01) 867 3770

© 2009 Balfour Beatty Ireland | Designed by Mosaic Studios